A demolition and replacement scheme brought a main house, basement, garage, detached dwelling, pool and roof deck onto one parcel. I worked with the architect’s team from schematic design through the late rounds of plan check.

The house, detached dwelling, pool and driveway share one parcel. The cyan band identifies the edge addressed in the utility review.
FIG. 01The house, detached dwelling, pool and driveway share one parcel. The cyan band identifies the edge addressed in the utility review.Site and utility review
Project brief

A residential replacement through plan check

The city asked us to document an easement and obtain utility clearance. In my conversations with the utility, its staff disputed the easement the city had identified. I coordinated the drawings through successive review rounds as the delay put pressure on project finances. The plans were in late corrections when I left.

Setting
Private residential commission
Practice
Ames Peterson
My role
Schematic design participation, model and drawing development, consultant and utility coordination, submittals and plan-check corrections.

Project credits

Initial design and project model by Ames Peterson. Edgar Cabadas worked with the project architect from schematic design through late plan-check corrections.